Public Health

SCOPE OF WORK:

1.    To calculate project water demand supported by calculations
2.    To locate and finalize UGWT position from client and architects.
3.    To design and layout water distribution system from main UG reservoir to overhead tank showing line layout, pipe sizes and pumping system.
4.    To design terrace ring for individual buildings.
5.    To design downtake water lines from overhead tank to individual toilets.
6.    To prepare internal layout of all toilets showing fixtures, supply lines and drainage lines for standard toilets.
7.    To prepare drainage line plan at ground level showing manholes, inspection chamber positions, ground level, invert level and depth of cutting.
8.    To give detailed working drawings of under ground and overhead water supply tanks.
9.    To design and locate terrace rainwater downtake lines.
10.    To prepare storm water disposal and rainwater harvesting system for entire project.
11.    To design pump requirements and give pump specifications.
12.    To visit the site during execution of work as and when required with prior appointment.
13.    Design of Fire Fighting Services.